Summary: Emba: Operations Management

Study material generic cover image
  • This + 400k other summaries
  • A unique study and practice tool
  • Never study anything twice again
  • Get the grades you hope for
  • 100% sure, 100% understanding
Use this summary
Remember faster, study better. Scientifically proven.
Trustpilot Logo

Read the summary and the most important questions on EMBA: OPERATIONS MANAGEMENT

  • 1 OPERATIONS MANAGEMENT FUNDAMENTALS

    This is a preview. There are 1 more flashcards available for chapter 1
    Show more cards here

  • 1.1.1 Introduction to Operations Management

    This is a preview. There are 1 more flashcards available for chapter 1.1.1
    Show more cards here

  • What is Operations Management (OM) goal?

    OM's goal is to design, maintain, and improve the processes by which businesses produce and deliver good and services to customers.
  • Why is OM also useful to personnel with managerial responsibilities?

    Because it offers insight into improving small intra-departmental processes as well as large inter-departmental processes.
  • It aims to optimize the use of resources and inputs to produce outputs.

    Operations Management
  • 1.1.2 The Process Flow Diagram

    This is a preview. There are 4 more flashcards available for chapter 1.1.2
    Show more cards here

  • True or False. Does inventory include inputs yet to be processed, or outputs that have exited the process?

    False
  • The total number of flow units in the production line at any one time is called

    Inventory
  • The ________ is the number of flow units that complete the process within a specified time span.

    Flow Rate
  • True or False. Flow time is not equal to flow rate.

    True
  • 1.1.3 Bottlenecks, Wait Times, and Process Capacity

    This is a preview. There are 2 more flashcards available for chapter 1.1.3
    Show more cards here

  • How to spot a bottleneck task?

    The number of customers in the queue increases
  • True or False. The capacity of any process is defined by its weakest link.

    True
  • 1.1.4 Process Structures: Job Shops to Assembly Line Flows

    This is a preview. There are 1 more flashcards available for chapter 1.1.4
    Show more cards here

  • True or False. One drawback of batch processing is that wait times for products and services can be longer.

    True

To read further, please click:

Read the full summary
This summary +380.000 other summaries A unique study tool A rehearsal system for this summary Studycoaching with videos
  • Higher grades + faster learning
  • Never study anything twice
  • 100% sure, 100% understanding
Discover Study Smart