1 Stored programming system exam
This is a preview. There are 30 more flashcards available for chapter 1
Show more cards here -
What knowledge and skills are essential for IEC component-related operations according to the document?
- Understanding of IEC symbols, designations, and numbering.
- Knowledge of component operation/testing.
- Ability to read circuit diagrams.
- Sensor operation and testing knowledge.
- Skills in equipment use for testing.
- Reading terminal allocations.
- Understanding PLC code operation.
-
What are the rules for input device placement in a relay logic diagram?
- Rule 1: Place input devices near the left corner of the rung.
- Rule 2: Only one input device near the right corner of the rung.
- Rule 3: Connect in series, parallel, or both.
- Rule 4: Output devices cannot connect in series.
- Rule 5: One device per rung in the diagram.
- Rule 6: Keep input and output devices horizontal.
-
What should be included in a checklist for component installation?
- Verify components are to design specs.
- Check mounting is secure.
- Ensure terminations are correct.
- Confirm connections are wired.
- Check services are correct.
- Ensure alignment with design specs.
-
What are the components listed under section 3.1 for a stored program system?
- 3.1.1: ON/OFF detent switch
- 3.1.2: Start the system ON/OFF
- 3.1.3: Normally open push button
- 3.1.4: Normally open push button
- 3.1.5: Normally closed push button
- 3.1.6: Stop the automated system
- 3.1.7: Indicator lamp 220 V
- 3.1.8: Indicator lamp 48 V
-
How is testing and ensuring proper operation highlighted in the document?
- Use a checklist for design specification adherence.
- Align services and secure connections.
- Use markers with discretion to troubleshoot.
- Test for presence of voltages.
-
Describe the flow and numbering requirements for relay logic diagrams.
- Flow in relay diagrams is from left to right.
- Number and label rungs for clarity.
- Include control and interlocking modules between input/output devices.
-
What is required in a graphical PLC application software source code?
- Represent with pictures.
- Written PLC application software must use structured text or words.
-
Explain the functionalities outlined in section 3.2 related to stored program systems.
- 3.2.1: Terminal list
- 3.2.2: Connection list
- 3.2.3: Working circuit
- Identify components that may appear in the PLC source or program.
-
What components are preprogrammed or programmed by user application in controllers?
- Preprogrammed: Embedded controllers by the manufacturer.
- User programmed: Software within controllers via user application.
-
Outline the logic gates mentioned for stored programme systems L3.
- AND gate switching logic.
- OR gate switching logic.
- Latching circuit logic.